

Locals on edge as soil test for north coastal rd set to begin | Mumbai News – The Times of India
Mumbai: Residents of Charkop Sector 8 are on edge after a BMC-appointed contractor began bringing in material for a test pile foundation study as part of Versova-Bhayander Link Road project, also More...

Coastal road sees 4k more vehicles daily after sea link connector opens | Mumbai News – The Times of India
Mumbai: Nearly a month after the southbound bridge connecting Bandra-Worli Sea Link and Mumbai Coastal Road was opened for motorists, around 4,000 more vehicles are now using the high-speed corridor More...

Uneven patches row: BMC completes bitumen laying work on Haji Ali bridge | Mumbai News – The Times of India
Mumbai: The BMC-appointed contractors completed work on laying bitumen on the main bridge at Haji Ali under the Mumbai Coastal Road last week. The patches on the northbound stretch of the coastal More...

BMC: Coastal road will be smooth in 15-20 days | Mumbai News – The Times of India
Mumbai: In view of the controversy surrounding patches on the Mumbai Coastal Road which opened to traffic less than a year ago, the BMC on Friday clarified that the visuals and photographs being More...

Mumbai Coastal Road patchwork row: BMC says no defects, calls it preventive measures | Mumbai News – The Times of India
The BMC addressed concerns about the patches on Mumbai Coastal Road, explaining they are protective mastic layers to prevent potholes, not construction defects. MUMBAI: In view of the controversy More...

Mumbai Coastal Road Patchwork sparks outrage among motorists | Mumbai News – The Times of India
Patchwork on Mumbai’s Rs 14000 crore Coastal Road, disappointing many MUMBAI: A video went viral on social media X (formerly Twitter) showing patchwork on the Mumbai coastal road’s northbound More...

AS british bridges are replaced, TRAFFIC TURMOIL likely Till 2030 – The Times of India
Why is driving in Mumbai, especially in its southern parts, so miserable despite the opening of the Coastal Road? It turns out that the city’s already choked heart is beating without four key arterial road More...

On day 1, 21k+ use south sea link-coastal rd bridge – The Times of India
Mumbai: Monday marked the first day of the southbound bridge connecting the Bandra-Worli Sea Link to Mumbai Coastal Road for motorists. So far, only the northbound bridge had been opened to traffic.On More...

Residents launch online petition against hoardings on Coastal Road – Times of India
Mumbai: The residents of Breach Candy and Nepean Sea Road have started an online petition opposing the recent approval of advertising hoardings along the city’s Coastal Road by the Maharashtra More...

Two fire stns proposed for coastal road emergencies | Mumbai News – Times of India
Mumbai: Mumbai fire brigade has proposed two fire stations to the civic body’s coastal road department, each spanning 1,500 square metres, along the reclaimed land of the Mumbai Coastal Road. More...
