Published On: Fri, Mar 28th, 2025

On Apr 3, revised water supply hrs in H-West ward | Mumbai News – The Times of India


On Apr 3, revised water supply hrs in H-West ward

Mumbai: As the BMC is carrying out work to commission a new main water pipe for Pali Hill reservoir on April 3 from 9am to 12pm, there will be a change in water supply timings in Khar Danda, Bazaar and Dr Ambedkar Marg areas of H-West ward. The revised timings for Bazaar area are 5.30am to 9am, and for Khardanda Koliwada, Dhandpada, Chuim Gaothan areas, and some parts of Gajdarbandh slum, 5.30pm to 8.30pm, while some parts of Khar (W) will have supply at low pressure. The revised timings for Dr Ambedkar Marg area, Pali Gaonthan, Pali Hill and some parts of Bandra (W) and Khar (W) are 12pm and 3am. tnn
Mumbai: As the BMC is carrying out work to commission a new main water pipe for Pali Hill reservoir on April 3 from 9am to 12pm, there will be a change in water supply timings in Khar Danda, Bazaar and Dr Ambedkar Marg areas of H-West ward. The revised timings for Bazaar area are 5.30am to 9am, and for Khardanda Koliwada, Dhandpada, Chuim Gaothan areas, and some parts of Gajdarbandh slum, 5.30pm to 8.30pm, while some parts of Khar (W) will have supply at low pressure. The revised timings for Dr Ambedkar Marg area, Pali Gaonthan, Pali Hill and some parts of Bandra (W) and Khar (W) are 12pm and 3am. tnn

.



Source link

About the Author

-

Leave a comment

XHTML: You can use these html tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>